BMW MINI of El Paso

6318 Montana Ave El Paso, TX 79925

2026 BMW M4 Competition xDrive at BMW MINI of El Paso

2026 BMW M4 Competition xDrive

Precio de venta : $91,915

Vehicle Basics

  • Tipo de vehiculo : BMW
  • Modelo de vehículo : M4
  • Condición : Used
  • Kilometraje : 2,233
  • VIN : WBS33HK03TCW12771
  • Valores # : TCW12771
  • Motor : 3.0L Straight 6 Cylinder Engine
  • Transmisión : 8-Speed A/T
  • Color Exterior : Isle of Man Green Metallic
  • Color Interior : Kyalami Orange/Black
  • Tipo de vehiculo : Coupe
  • Tipo de cuerpo : 2dr Car
  • Tipo de unidad : AWD
Ciudad MPG * 16 Autopista MPG * 23

*La clasificación MPG real variará con las opciones, las condiciones de conducción, los hábitos y la condición del vehículo.

Competition xDrive trim. Excellent Condition, GREAT MILES 2,233! Heated Leather Seats, Nav System, Back-Up Camera, Power Liftgate, Aluminum Wheels, Turbo Charged Engine, FRONT VENTILATED SEATS, All Wheel Drive.

KEY FEATURES INCLUDE
Leather Seats, Navigation, All Wheel Drive, Power Liftgate, Back-Up Camera

OPTION PACKAGES
FRONT VENTILATED SEATS.

WHY BUY FROM US
Buy with confidence at Group 1 where every pre-owned vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile exchange policy. Some exclusions may apply, see Buyers Guide for specifics. Every vehicle is priced to market and includes a Carfax History Report.

MARKET-BASED PRICING
You expect fair & competitive pricing. Thats why the price is based on current market data and is regularly compared to similar pre-owned vehicles in the region.

QUALITY INSPECTIONS
Every vehicle is thoroughly inspected and comes with a complimentary vehicle history report.

QUICK & TRANSPARENT FINANCING
Need Financing? Apply in minutes with all terms and conditions clearly disclosed upfront.

VEHICLE SERVICE CONTRACTS
Avoid bumps in the road! Adding a service contract can help prevent future unexpected expenses from arising. Available for most purchases.

PURCHASE WITH CONFIDENCE
CARFAX 1-Owner AutoCheck One Owner

WHO WE ARE
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.

Please confirm the accuracy of the included equipment by calling us prior to purchase.

Vea otros vehículos en BMW MINI of El Paso

Información del Concesionario

MINI

BMW MINI of El Paso

BMW MINI of El Paso

Características del vehículo

  • 453

Renuncia & Información legal

Los precios no incluyen cargos adicionales y costos de cierre, incluyendo impuestos e impuestos gubernamentales, cargos de financiamiento, cargos de documentación del distribuidor, cuotas de prueba de emisiones u otros cargos. Todos los precios, especificaciones y disponibilidad están sujetos a cambios sin previo aviso. Póngase en contacto con el distribuidor para obtener la información más actualizada. Los precios son válidos hasta el cierre del negocio, sólo hoy.