2025 BMW M3 Competition xDrive at BMW MINI of El Paso
https://spanishmini.dealerleads.com/cars/Used/2025/BMW/M3/Competition+xDrive/176505482025 BMW M3 Competition xDrive
Precio de venta : $95,915
Vehicle Basics
Incentivos Adicionales
- Condición : Used
- Kilometraje : 6,492
- VIN : WBS33HJ02SFU23821
- Valores # : SFU23821
- Motor : 3.0L Straight 6 Cylinder Engine
- Transmisión : 8-Speed A/T
- Color Exterior : Special Order Color
- Color Interior : Black
- Tipo de vehiculo : Sedan
- Tipo de cuerpo : 4dr Car
- Tipo de unidad : AWD
Ciudad MPG *
16
Autopista MPG *
23
*La clasificación MPG real variará con las opciones, las condiciones de conducción, los hábitos y la condición del vehículo.
Características del vehículo
- ZPK
- ZPX
Renuncia & Información legal
Los precios no incluyen cargos adicionales y costos de cierre, incluyendo impuestos e impuestos gubernamentales, cargos de financiamiento, cargos de documentación del distribuidor, cuotas de prueba de emisiones u otros cargos. Todos los precios, especificaciones y disponibilidad están sujetos a cambios sin previo aviso. Póngase en contacto con el distribuidor para obtener la información más actualizada. Los precios son válidos hasta el cierre del negocio, sólo hoy.
KEY FEATURES INCLUDE
Leather Seats, Navigation, All Wheel Drive, Rear Air, Heated Driver Seat
OPTION PACKAGES
EXECUTIVE PACKAGE Remote Engine Start, Power Tailgate, Full LED Headlights w/Cornering Lights, BMW Curved Display w/HUD, Heated Steering Wheel, PARKING ASSISTANCE PACKAGE Parking Assistant Plus.
WHY BUY FROM US
Buy with confidence at Group 1 where every pre-owned vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile exchange policy. Some exclusions may apply, see Buyers Guide for specifics. Every vehicle is priced to market and includes a Carfax History Report.
MARKET-BASED PRICING
You expect fair & competitive pricing. Thats why the price is based on current market data and is regularly compared to similar pre-owned vehicles in the region.
QUALITY INSPECTIONS
Every vehicle is thoroughly inspected and comes with a complimentary vehicle history report.
QUICK & TRANSPARENT FINANCING
Need Financing? Apply in minutes with all terms and conditions clearly disclosed upfront.
VEHICLE SERVICE CONTRACTS
Avoid bumps in the road! Adding a service contract can help prevent future unexpected expenses from arising. Available for most purchases.
BUY WITH CONFIDENCE
CARFAX 1-Owner AutoCheck One Owner
VISIT US TODAY
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.
Please confirm the accuracy of the included equipment by calling us prior to purchase.