BMW MINI of El Paso

6318 Montana Ave El Paso, TX 79925

2026 BMW M4 Competition xDrive at BMW MINI of El Paso

2026 BMW M4 Competition xDrive

Precio de venta : $108,970

Vehicle Basics

  • Tipo de vehiculo : BMW
  • Modelo de vehículo : M4
  • Condición : New
  • Kilometraje : 47
  • VIN : WBS43BA07TCW80137
  • Valores # : TCW80137
  • Motor : 3.0L Straight 6 Cylinder Engine
  • Transmisión : 8-Speed A/T
  • Color Exterior : Alpine White
  • Color Interior : Fjord Blue/Black
  • Tipo de vehiculo : Convertible
  • Tipo de cuerpo : Convertible
  • Tipo de unidad : AWD
Ciudad MPG * 16 Autopista MPG * 22

*La clasificación MPG real variará con las opciones, las condiciones de conducción, los hábitos y la condición del vehículo.

Heated Leather Seats, Nav System, Premium Sound System, Back-Up Camera, All Wheel Drive, Aluminum Wheels, EXECUTIVE PACKAGE, PARKING ASSISTANCE PACKAGE. Competition xDrive trim, Alpine White exterior and Fjord Blue/Black interior.

KEY FEATURES INCLUDE
Leather Seats, All Wheel Drive, Back-Up Camera, Turbocharged, Premium Sound System

OPTION PACKAGES
DRIVING ASSISTANCE PROFESSIONAL PACKAGE Distance Control Assist (DCA) w/Steering Assistant, Driving Assistant Professional, Partial Automated Driving, Traffic Jam Assistant, EXECUTIVE PACKAGE Remote Engine Start, Live Cockpit Pro w/Navigation, Galvanic Controls, PARKING ASSISTANCE PACKAGE Parking View w/3D View (Surround View), Parking Assistant Plus, FRONT VENTILATED SEATS.

WHY BUY FROM US
Buy with confidence at Group 1 where every used vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile exchange policy. Some exclusions may apply, see Buyers Guide for specifics. Every vehicle is priced to market and includes a Carfax History Report.

WHO WE ARE
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.

Please confirm the accuracy of the included equipment by calling us prior to purchase.

Vea otros vehículos en BMW MINI of El Paso

Información del Concesionario

MINI

BMW MINI of El Paso

BMW MINI of El Paso

Características del vehículo

  • 453
  • ZDY
  • ZPK
  • ZPX

Renuncia & Información legal

Los precios no incluyen cargos adicionales y costos de cierre, incluyendo impuestos e impuestos gubernamentales, cargos de financiamiento, cargos de documentación del distribuidor, cuotas de prueba de emisiones u otros cargos. Todos los precios, especificaciones y disponibilidad están sujetos a cambios sin previo aviso. Póngase en contacto con el distribuidor para obtener la información más actualizada. Los precios son válidos hasta el cierre del negocio, sólo hoy.